Research
was conducted into the drainage aspects of living wall systems. Given the
highly visual aspects of attached retrofitted drainage to existing walls, the
design and landscape team deemed it fit to remediate the existing internal
ground floor slab and place below slab drainage for the new living wall.
Living wall retrofit of Rydges at Southbank (image courtesy of BDS) |
Unsightly retrifit of living wall drainage. (image courtesy of BDS) |
The
strategy for the internal green wall drainage was to remediate the existing
slab and place below ground pipe work so as to irrigate and drain the living
wall.
Collaboration
between interior landscape team and site team would be necessary to articulate
the drainage remediation in the landscape model, ie, the interior landscape
model team would not be able to issue integrated construction drawings of the
slab work.
Below slab drainage for living wall. |