Cleaned drawing - after elements are hidden.
Adding revision numbers and description.
Drawings Cleanup
At the end of the modelling process for this stage a cleanup of the drawings was required to take place in the Architecture model to make sure they were to a high presentation standard. This included:
- Making sure north points were on all drawings
- Hidding elements not needed for presentation drawings (sections used for working in the model etc.)
- Adding a revision number and reason for issue.
- Filling out the title block to include all relevant information.
No comments:
Post a Comment