Detail individual student input into the BIM project collaboration process and reflect on the process with team members
Revised Role:
BIM manager - setting up Revit files, quality assurance checking, general BIM coordination leader
Schematic Design - Architecture, Structure, delivering design concept
Design Development - Interior and Architecture modelling and design execution, presentation drawings.
Input into the BIM project collaboration process: Worked collaboratively with Hasini and Sam in design stage of Interior and Architecture models. Meeting with each of the team members to discuss design execution in their concept as well as quality assurance checking in each of the discipline models.
Refection on the process with team members: The team worked very cohesively throughout all stages of the project. Structuring a set time each week to meet and work together on the project outside of class was extremely useful in terms of project development and collaboratively finding a solution to any issues which arose in the models. Having a strong concept and direction in the Design Brief Response document at the beginning of the project allowed everyone to gage what needed to be done to achieve the goals which were set out at the start of each week.
Revised role: Architecture and the interior design modelling, solibri model checking
Input into the BIM project collaboration process: Working collaboratively with the Kristy in modelling and designing the studio spaces. Model analysis for errors
Refection on the process with team members: I felt the team worked well collaboratively and always communicated well with each other. We all generally assisted each other through the process which made the collaboration process a great success The only thing we could do the improve in future is to work on more model checking at the start of our project. This will allow us to recognise errors at the initial model set up stage.
Revised role:
My roles in the project where specifically:
Schematic Design Team - Architecture
Schematic Design Team - Landscape
Architecture
Landscape Architecture Model Creation and
Delivery
Interior landscape Model Delivery Creation
and Delivery
Input into the BIM project collaboration process:
Building Information Model Management Plan
– formulation, delivery, amendment and management
Refection on the process with team members:
This team member views the perceived team success
of the project as being due to:
1. Shared
goals and beliefs in project outcomes.
2. A
recognition of each of the team members strengths.
3. A genuine
caring within the team for each of the team members and the desire to assist
each in reaching their goals.
Revised role:
Input into the BIM project collaboration process:
My roles in the project where specifically:
Schematic Design Team - Architecture
Interior Design Team - Gallery Space Design and Modelling
Lighting Consultant tasked with lighting analysis and Implementation
Initial Site Model Delivery Including existing Built context
Refection on the process with team members:
I believe a number of factors lead to the success of this project as a team
1. An acknowledgment of Each other roles and responsibilities while still understanding the flexible nature of the project and a willingness to respond to that.
2. A clear and concise goal was shared between all members of the group.
3. An acknowledgment and respect for each other as designers and people
4. We were lucky enough to get on really well.